Superior filtration from the inside out. The Series pool filter with pump features an integral top diffuser that evenly distributes unfiltered water over the sand media bed in a cascading, umbrella-like pattern.This allows the greatest filtration possible from every square inch of sand. Then the self-cleaning under-drain assembly, with its 360 degree slotted laterals, provides a fast, balanced flow of clear water back to the pool while allowing for more thorough backwashing.Best of all, full-flow technology reduces your energy costs because the filter operates for shorter periods.
Applicable Places of swimming pool sand filter
It is the best choice for filtering swimming pools, aquariums, aquatic parks, and industrial wastewater treatment equipment.
The feature of a swimming pool sand filter: 1) A unique and advanced design ensures fast draining and stabilizes water flow 2) The sand filter comes with a precise pressure gauge 3) Efficient multi-lateral underdrain assembly and self-cleaning laterals give totally balanced flow and backwashing 4) It is easy to install and to maintain 5) The outlet turbidity is less than 2FTU
The feature of a swimming pool sand filter and pump: 1) Unique and advanced design ensures fast draining and stabilizes water flow 2) The sand filter comes with a precise pressure gauge 3) Efficient multi-lateral underdrain assembly and self-cleaning laterals give totally balanced flow and backwashing 4) It is easy to install and to maintain 5) The outlet turbidity is less than 2FTU
Display of a normal swimming pool sand filter and pump
Why Choose Us
Guangzhou Siwook Swimming Pool & Sauna Equipment Co., Ltd., established in 2013, professional in producing and sellingswimming pool equipments, sauna equipments, SPA equipments and fountain equipments.etc. Striving in creating, quality and service for these years, we have possessed our own brand, in the meantime, have developed our foreign market of around one hundred countries as well as developed a sales network covers most of the eastern big cities at home.
Manufacturing Technique
FAQ
1 ) Payment:30% in advance,+70% balance should be paid before delivery. 2 ) Lead time:1x20ft for 15 days;1x40ft for 20 days 3 ) Port of loading:guangzhou,Mainland china. 4 ) Discounts are offered based on order quantities.